March 27, 2025CHAWF Secondary Lining
Project Completion
Programme Weeks

Client: CVB
Sector: Water
Location: London
Overview
Kelly Formwork have been appointed as subcontractor to deliver the secondary lining works as part of the Thames Tideway project. Working with Tunnel Formwork Designers and Manufacturers Kern Tunneltech, the six number sections are 12m long, 7m diameter sections are being lowered down the shaft and constructed over the forthcoming weeks. Once joined together, the tunnel formwork will be over 70m in length and travel more than 6km under the Thames.
Key Strategy
- Advanced Concrete Mix Design
- Innovative Construction Techniques
- Robust Quality Control Measures
- Environmental Protection Measures