KEMPF
March 27, 2025
M11 J7
March 27, 2025Earl Pumping Station
Project Completion
Programme Weeks

Client: CVB
Sector: Water
Location: London
Overview
Thames Tideway Tunnel is a 25 km (16 mi) combined sewer under construction running mostly under the tidal section (estuary) of the River Thames across Inner London to capture, store and convey almost all the raw sewage and rainwater that currently overflows into the estuary. Our main works consist in building the Combined Sewer Overflow (CSO) EARPS structure that will intercept the flows from the existing Thames Water sewerage assets.
Key Strategy
- Advanced Concrete Mix Design
- Innovative Construction Techniques
- Robust Quality Control Measures
- Environmental Protection Measures